From Early Planning to Construction-Phase Compliance
Seneca Services prepares construction management, traffic and logistics plans to support planning applications, meet validation requirements and discharge pre-commencement planning conditions across London.
Where a Principal Contractor has not yet been appointed, we can prepare an assumption-led document using the available design and programme information. Once appointed, we coordinate with the contractor to incorporate project-specific access, deliveries, logistics, programme and control measures for the final submission.
Local authorities use different titles and formats for these documents. We identify the applicable requirements and can support neighbourhood consultation, contractor information gathering and swept-path analysis where needed.
Where environmental management requirements also apply, see our Site Environmental Management Plan (SEMP) Guide.
Site Logistics Plans
What We Can Deliver
We prepare construction management and logistics plans for planning applications, validation and condition discharge. Depending on the project, the package can include vehicle routing plans, site logistics layouts, swept-path drawings, delivery and vehicle movement forecasts, and support with neighbour consultation.
If you appoint us at planning application stage, we can use the available design and programme information to prepare the plan and identify what the Principal Contractor will need to confirm. Once the contractor is appointed, we can coordinate their input and update the plan for condition discharge. Where dust, noise or Section 61 documentation is also required, we can coordinate it with the construction management and logistics plans.
What is a Construction Management Plan (CMP)?
Construction Management Plans set out how the construction phase will be organised and controlled, including site access, deliveries, working hours, programme information, environmental controls, neighbour liaison and other project-specific management measures.
Construction Traffic & Logistics Plans
Construction Traffic and Logistics Plans define the proposed delivery and servicing strategy, vehicle routes, loading arrangements, access and egress, delivery controls and measures for managing construction traffic safely and efficiently around the site.
Site Construction Management Plans (SCMP) & Local-Authority Formats
Local authorities use different titles, formats and pro-formas for construction management documentation, often supported by a Code of Construction Practice or equivalent borough-specific guidance. We identify the applicable requirements and prepare the appropriate plan, including Site Construction Management Plans, Construction Traffic Management Plans and other authority-specific formats where required.
For projects in the Royal Borough of Kensington and Chelsea, see our RBKC SCMP & Code of Construction Practice Guide.
What is a Construction Logistics Plan?
A Construction Logistics Plan sets out how construction traffic, deliveries, loading, vehicle access and site logistics will be managed safely and efficiently throughout the works. It typically identifies vehicle routes, delivery arrangements, access and egress, loading locations, traffic-management controls and measures to minimise impacts on the surrounding highway and neighbouring properties.
Also require dust, noise or Section 61 documentation? View our Construction Dust, Noise & Section 61 services.
Need Help Identifying the Right Plan?
Send us the planning condition or validation requirements and we will confirm the appropriate construction management, traffic or logistics plan and the information needed to prepare it.